which prepare work need to do before run GiantLin block machine?

 

1. Observe timely and fasten the nuts in all parts in case of loosing.

 

2. Add 46# wear-resistant hydraulic oil in machine hydraulic oil tank. Need about 200KG (Hydraulic oil more than "70" in machine oil displayer).

Fist time hydraulic oil need to change after 6 months later, then 1-2 years change again.When hydraulic oil temperature near 60 ℃, you must use water cooler on hydraulic station. The more hydraulic oil you add, the slower temperature increase. GiantLin block whatsapp: +86 15269722300

news-152-152

news-210-151

3. All reduction gears need to add 40# or 50# lubricating oil. First time add lubricating oil, then after 15 days, change new lubricating oil, then change lubricating oil after 3-6 months. Do not forget to add oil in vibration box. Check the oil level vibration box per week.

 

4. All machine movement parts need to paste lubricating oil.

Video link show some parts how to add oil: https://youtu.be/BZhbcUXTQt0

 

5. Connect 380V, 50HZ, 3 phase electric power; Main electric power wire 16 square millimeter

news-260-150

6. Rotating Direction of Oil Pump:Rotating direction same with mark (Marked on Pump). Vibration platform motor rotate direction should opposite rotation.

7. GiantLin block machine need to do concrete foundation. Please ask before delivery (GiantLin block machine manufacturer: whatsapp: +86 15269722300)

8. After a day of work, the machine especially the mold should be cleaned and lubricate the machine. If concrete dry on machine, especially on mold, machine can not work well, and easy broken.

 

 